The Harrogate to Wetherby line was the first to be shut in 1964 under Doctor Beeching's proposed cuts. Midway, is the Prospect tunnel. Here readers, is the southern portal.
The line had been running down over a number of years prior to this, a far cry from when it opened in 1848.
The tunnel cuts through a very straight 825 yards underneath Follifoot ridge.
The tunnel, although dead straight is surprisingly photogenic.
It's a good one for some light painting. Step one, line up the camera on yer tripod by using the flash. These always look rubbish.
Step two, turn on the big torch. They always look a lot better with a long exposure using a big torch.
Merge of the two done by someone called Chris at work because I don't know how do do stuff on Photoshop.
I guess the farmer who's land it is one has been through with his Land Rover recently to clear out the drain. Water drips from the roof in parts, and regularly the tunnel floods.
The bore is 81' below the surface and has a total of 3 air shafts. They were boarded over and covered in cement in 1981.
Reflections
The cutting at the other end of the tunnel.
A view of the Prospect tunnel looking from the northern portal. The white dot is the other end, over half a mile away.
The line had been running down over a number of years prior to this, a far cry from when it opened in 1848.
The tunnel cuts through a very straight 825 yards underneath Follifoot ridge.
The tunnel, although dead straight is surprisingly photogenic.
It's a good one for some light painting. Step one, line up the camera on yer tripod by using the flash. These always look rubbish.
Step two, turn on the big torch. They always look a lot better with a long exposure using a big torch.
Merge of the two done by someone called Chris at work because I don't know how do do stuff on Photoshop.
I guess the farmer who's land it is one has been through with his Land Rover recently to clear out the drain. Water drips from the roof in parts, and regularly the tunnel floods.
The bore is 81' below the surface and has a total of 3 air shafts. They were boarded over and covered in cement in 1981.
Reflections
The cutting at the other end of the tunnel.
A view of the Prospect tunnel looking from the northern portal. The white dot is the other end, over half a mile away.