Cwmorthin Slate Mine, Blaenau Ffestiniog- Apr 2012

Derelict Places

Help Support Derelict Places:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Landsker

Veteran Member
Veteran Member
Joined
Jun 17, 2008
Messages
308
Reaction score
598
Location
South Wales
Well this is my second visit in as many weeks and still have only just scratched the surface, this place is just HUGE! Visited with The Kwan, Xan_Asmodi, Sim2lew and Cunningcorgi....


History

It was run by several different companies as a venture in its own right during the 1800's. The earlier underground workings started at "Lake Level", so called due to the entrance being just above the surface of the nearby Llyn Cwmorthin, and ascended upwards in the mountain ultimately for 8 floors in both the Old and Back Vein. Poor working practices and reckless engineering decisions ultimately led to a substantial collapse and the end of that company.

A new company took the mine on afterwards and reused Lake Level but sealed off the shattered and dangerous upper floors. Instead, they developed new workings below, going down into the mountain. Ultimately this company sunk five floors on both veins, before itself being being forcibly closed in 1901 due to a legal dispute.

The now abandoned lower floors flooded up to Lake Level, containing an immense amount of water hundreds of feet deep, which remained until the early 1930's. The neighbouring mine (Oakeley Quarries) were at this time driving underneath the old Cwmorthin workings and were uneasy about having such a huge volume of water above them, so decided to drain it out. Special diamond-drilled bore holes were driven through into the deepest parts of Cwmorthin from Oakeley and the water drained out under controlled conditions.

When the water level reached the bottom, the mines were connected in several places by full-size tunnels and Oakeley (who'd taken over the ownership of Cwmorthin) actually re-opened some of Cwmorthin and put men to work in it. The Back Vein Incline was re-equipped and even a new incline was driven down another 90 vertical feet to open some more chambers.

Cwmorthin then operated essentially as just another part of Oakeley right up until 1970 when Oakeley itself closed. This marked the end of the mine's working life as a major concern, however, throughout the 1980's and early 1990's the mine was working on a limited scale by a small team of local men. Extraction occurred in a few chambers on Lake Level and Level 1, with the underground transport being provided by a Series 2 Land Rover 88".


1



2



3



4



5



6



7




8




9



10

 
Last edited:

Latest posts

Back
Top