visited the unit super heaters site last nite the site has been there for 100years and makes boilers and pressure vessel for the oil and gas industry link to what they make http://www.unit.co.uk/power_industry.html the site is well underway for demolition and one of the units has been removed all ready visted with polygon and co
the main gate
the demolition is well underway thay have got rid of 2 buildings so far
the inside of one of the sheds with obligatory chair shot
random valve
box of bits on the wall
crane hook
the control for the gantry crane loads of them on site rated to 10 tonnes each
some one left the coat behind
the medical room still had the equipment inside
air supply
bed in the medics room
a set of scales rated to 30 tonnes
the x ray test sheet for x ray testing of welds
the managers office more tea anyone
the main gate
the demolition is well underway thay have got rid of 2 buildings so far
the inside of one of the sheds with obligatory chair shot
random valve
box of bits on the wall
crane hook
the control for the gantry crane loads of them on site rated to 10 tonnes each
some one left the coat behind
the medical room still had the equipment inside
air supply
bed in the medics room
a set of scales rated to 30 tonnes
the x ray test sheet for x ray testing of welds
the managers office more tea anyone